Status: Proposed investmentWhy disclosure?
FMO is committed to making publicly available relevant investment information that informs stakeholders and enables them to engage directly with FMO on its investments which, in turn, enhances our investment decisions, the design and implementation of projects and policies, and strengthens development outcomes. Learn more
In case of questions
We welcome feedback on this proposed investment opportunity for FMO. The ending of the proposed investment phase is indicated on the right side of this page. In case of questions, please contact us at disclosure@fmo.nl
Disclaimer
The information as disclosed is indicative and provided on an "as-is/as available" basis for general informational purposes only and should not be construed as financial, legal or investment advice, nor as a commitment or an offer to arrange or provide any financing. The final decision to provide financing is subject to the terms and conditions of FMO in its sole and absolute discretion. When providing links to other sites, FMO bears no responsibility for the accuracy, legality or content of the external site or for that of subsequent links. The information on proposed investment for high-risk investments is made available in the language relevant to the country or region where the bulk of operations take place. Translations of any information into languages other than English are intended as a convenience for local stakeholders. In case of any discrepancy, the information provided in English will prevail.
Who is our prospective customer?
Zemec S.A. is the Special Purpose Vehicle established in Ecuador to develop and operate Project NASCA. The Project will be owned by three Ecuadorian sponsors: PalmarHolding SAS, parent company of Acería del Ecuador C.A., (ADELCA), Acervo Holding SAS, a holding company of Sevilla y Martínez Ingenieros C.A. (SEMAICA), and Constructora Nacional S.A. (CN). ADELCA is the lead sponsor and prospective principal off taker. SEMAICA brings engineering and hydropower/tunnelling expertise, while CN contributes construction and hydropower operating experience.
What is our funding objective?
FMO is considering a USD 55 mln senior secured project finance loan to Zemec S.A., part of a total debt financing package expected to reach USD 105 mln. The financing is provided to support the construction, operation and maintenance of NASCA, a 48.5 MW run-of-river hydropower plant located in García Moreno, Imbabura, Ecuador. The Project includes the hydropower plant, a rock tunnel, an internal substation, access roads and a 230 kV transmission line connecting the Project to the existing grid infrastructure. The final transmission-line design and length remain subject to technical and environmental and social (E&S) studies. The current offtake strategy envisages ADELCA purchasing the majority of the Project's electricity under a long-term private Power Purchase Agreement (PPA), while the remaining electricity would be sold through additional private PPAs and/or to state-owned distribution companies.
Why do we want to fund this investment?
The proposed financing will support the development of 48.5 MW of new renewable generation capacity in Ecuador, a country facing a large structural generation deficit, exacerbated by a high vulnerability to droughts which lead the country to severe black outs in 2024. The Project is aligned with the Government of Ecuador’s efforts to increase private-sector participation in power generation and encourage large industrial consumers to develop self-generation capacity. FMO’s financing will therefore contribute to increasing renewable generation capacity, strengthening energy security and supporting private-sector participation in Ecuador’s electricity sector. FMO’s involvement will also support the application of international E&S standards, including high biodiversity standards, in the development of the Project.
What is the Environmental and Social categorization rationale?
This is a Category A investment because of the potential environmental and social risks associated with the project’s location. The run-of-the-river hydropower project is located in a biodiversity hotspot with potential impacts on critical habitat, and the proposed transmission-line alignment affects an Alliance for Zero Extinction area. The project is also being developed in a socially sensitive context with community concerns linked to previous mining activities. In line with the applicable IFC Performance Standards, the key risks requiring assessment and appropriate management include stakeholder engagement and community support, potential economic displacement (e.g. loss of arable land), labor and high-risk working conditions; potential community impacts related to tunnelling; uncertainties regarding environmental flows and climate-change analysis; and potential archaeological findings. IFC Performance Standards 1–6 and 8 are applicable, covering E&S management and stakeholder engagement, labor and working conditions, resource efficiency, community health and safety, economic displacement, biodiversity, and cultural heritage; PS7 is not triggered, as we have not identified indigenous communities in the project’s area of influence. The sponsors have shown positive willingness and commitment to address the identified risks. They intend to revise the transmission-line alignment, commission additional biodiversity, environmental-flow, climate and tunnelling assessments, strengthen stakeholder engagement, and update the Environmental Social Impact Assessment (ESIA), project design, operating conditions and construction schedule accordingly. These measures, including the development of an Environmental Social Management System (ESMS), will be assessed and further defined through FMO’s E&S due diligence.
- Region
- Latin America & The Caribbean
- Country
- Ecuador
- Sector
- Energy
- Publication date
- 11/9/2026
- Deadline for feedback
- 1/8/2027
- Total FMO financing
- USD 55.00 MLN
- Funding
- FMO NV
-
Risk categorization on environmental and social impacts, A = high risk, B+ = medium high risk, B = medium risk, C = low risk
Environmental & Social Category
(A, B+, B or C) - A
- Additional information
- there is no website for the costumer nor investment. but there are websites for the three sponsors: constructora nacional: https://www.constructoranacional.com.ec/ adelca: https://www.adelca.com/ semaica: https://semaica.com/en/